Unclassified Archive
Like many of our peers across Europe, the Reid Brewin Architects team has packed up desks once more and moved to a remote working setup. Our London and Paris …
BIM Modeling & Revit Revit model – hotel feasibility study The global construction industry is moving towards 3D modeling of buildings rather than 2D drawing. AutoCAD, the software traditionally …
January 2016 at our Architectural Practice Personal Protective Equipment (PPE) – Safety protection on site Personal Protective Equipment (PPE) on a building site consists of various means or …
Developing Reid Brewin Architects in England Reid Brewin Architectes en Angleterre Developing Reid Brewin Architects in England Alex Reid and Adrian Brewin, partners in Reid Brewin Architectes, an …
May 2015 at our Architectural Practice Pantin Datacentre Phase 2 completed ahead of schedule RB-Architects handed over the 2nd phase of works at Pantin Datacentre to the client on …
August 2012 in our architectural practice For Reid Brewin Architects environmental responsibility is more than a concept, it is a voluntary process of quality management applied to environmental design …
August 2011 at our Architectural practice After 18 months of construction and 2 years of preliminary design studies, the extension to Global Switch’s datacentre campus in Paris is now complete. Reid …
January 2011 in our Architectural practice Efficient office design is critical to the success of any company. The space must be attractive and allow employees to feel at ease. Flexibility is …
December 2009 at our architectural practice Datacentre Park to the East of Paris The permit for a Data centre to the East of Paris was approved in …
September 2009 at our architectural practice Reid Brewin Architects have recently been working on a permit application for the conversion of an old postal sorting office, in the north …